Tủ điều khiển và giám sát

The project provides a full-ship alarm system for 2200HP tow vessels

Project name: New building of 2200HP towing vessel

Duration: Quarter II and III in 2011

List of devices offered: All-ship oil and water alarm system (Fuel tank, waste oil tank, clean water tank, bilge …)

Some system images:

Related Post

Leave a Reply